Washington HB 2741 (2025-26): votes and status — Project Euthyna
Washington · 2025-2026 Biennium (69th Legislature)
Concerning the electric transmission system.
AN ACT Relating to creating partnerships to improve the reliability and capacity of the electric transmission system, including through a Washington electric transmission authority;